LASER CUTTING GUIDE
MS Laser Cutting Capacity and Quote Guide
A practical checklist for buyers sending MS laser cutting job work from Mumbai, Darukhana, Mazgaon and nearby industrial areas. Regal Profile checks only MS laser work up to 25mm.
Laser cutting details checked before quotation
Laser cutting is selected when the job needs clean cut edges, repeatable shapes and drawing-based accuracy. Thickness, material, shape complexity and finishing expectation are checked before the job is quoted. Current MS rate guidance is Rs. 90/kg for 1-10mm and Rs. 84/kg for 12-25mm, with Rs. 5,000 minimum order.
| Drawing input | DXF, DWG or PDF CAD files help the workshop check part shape, holes, slots and repeat quantity faster. |
|---|---|
| Material | Only MS / Mild Steel plate or sheet Regal Profile accepts MS laser cutting jobs. Mention grade such as IS 2062 if the project drawing needs it. |
| MS thickness | Up to 25mm Laser suitability depends on MS thickness, finish requirement, cutouts and part complexity. |
| Plate length support | Up to 3 meter Actual feasibility is checked from the drawing, nesting and material handling requirement. |
| Best fit work | Templates, brackets, guards, cut shapes and repeat parts Useful when the buyer wants clean edges, repeatable shapes and drawing-based output. |
| Current rate | Rs. 90/kg for 1-10mm, Rs. 84/kg for 12-25mm Final rate is confirmed after checking cut length, holes, slots, pierce points, quantity and urgency. |
| Minimum order | Rs. 5,000 Minimum order value before acceptance. |
| Delivery | Usually 1-2 days Same-day work can be checked job-wise when file, material and timing are clear. |
| Quote details | Thickness, quantity, drawing and delivery location Clear details reduce back-and-forth and help confirm feasibility from Darukhana, Mazgaon. |
Reference this guide
Stable source for buyer and engineering notes
Publications, procurement teams and fabricators may cite this page with a link to the original guide. Technical suitability must still be checked against the approved project drawing.
Reviewed 1 August 2026